National hotline:13826586781(same as WeChat)
© begooo Creative 2004-2025
中文中EN

What should I prepare before a first full brand project?

Brand Strategy & Positioning· Updated · Views 3,280· Source: begoo Creative Insights
Written by: begoo Creative Insights· Reviewed by: begoo Creative planning director· First published: 2026-09-02· Updated: 2026-10-18
Short answer
Three things: a clear picture of your current business, a decision-maker who can sign off, and an acceptable budget and timeline. A full project starts with real store, product and customer data, not with design. The more concrete the input, the less the plan floats.

Audit the business before design

Before we design anything, we want the current business stated plainly: how many stores, whether the unit model works, average ticket and repeat rate, which customers contribute most, which products actually sell. The first step of a full project is putting these facts on the table, not looking at logos and colours. In most redo projects we take over, the problem is not visual — the company has not done its own numbers. The more concrete the material, the fewer rounds positioning and design need.

The decision-maker must be in the room

A full brand project changes names, language, visuals and stores, and touches several departments. You need one person who can decide; others can join the discussion but should not hold a parallel veto. Most delays we see are not slow design but internal opinions running side by side, with every review starting from alignment again. Confirm in advance who signs off, who attends and how often you meet — that is worth more than two extra rounds of proposals.

Set budget and timeline boundaries first

The budget does not have to be the lowest from day one, but it needs an acceptable range so the work can be delivered within cost. Leave time for internal digestion: one round of discussion for positioning, one round of feedback for visuals, and construction and sampling for stores. Treating budget and timeline as project boundaries rather than last-minute variables is what lets a project finish on time.

Bring your existing materials

Bring the current VI manual, old packaging, store photos, franchise policy, competitor screenshots and customer reviews to the first meeting. They look scattered but let us judge quickly what is an asset and what is baggage. Many companies prefer to hear the proposal first and supply material later, then spend two weeks guessing. Coming with real material in the first conversation often saves half a month of back and forth.

Key points

  1. Put store count, average ticket and repeat rate on one page
  2. Appoint one decision-maker to reduce internal back and forth
  3. Agree a budget range and available timeline as project boundaries
  4. Bring old VI, packaging and store photos to the first meeting
Related case
Tianfu — convenience store brand design
Tianfu — convenience store brand design View case

Have a follow-up question?Ask now

Still have a question? Talk to our planning director
138 2658 6781
Weekdays 9:00–18:00 · same as WeChat
← Back to Insights Q&A
National hotline:138 2658 6781 (same as WeChat)

-

Shenzhen begoo Creative Planning & Design Co., Ltd.

Shenzhen office

3019 Sungang East Road, Luohu District, Shenzhen
Baihui Building, North Tower, 28F

-

begoo Creative Design (Dongguan) Co., Ltd.

Dongguan office

Room 1001, Zhongfu Building, Zanhua Road, Nancheng District, Dongguan

Email:398482218@QQ.com

begoo Creative WeChat QRbegoo Creative official account QR
ICP filing: 粤ICP备11068490号 凤扬AI / Fengyang AI www.fengyangai.com